New Jersey Route 23
Route information | ||||
---|---|---|---|---|
Maintained by NJDOT | ||||
Length | 52.6 mi[1] (84.7 km) | |||
Existed | 1927–present | |||
Major junctions | ||||
South end | CR 506 / CR 577 in Verona | |||
North end | I-84 / US 6 in Port Jervis, NY | |||
Location | ||||
Country | United States | |||
State | New Jersey | |||
Counties | Essex, Passaic, Morris, Sussex | |||
Highway system | ||||
|
Route 23 is a state highway in the northern part of New Jersey, United States. The route runs 52.6 mi (84.65 km) from Bloomfield Avenue (CR 506) and Prospect Avenue (CR 577) in Verona, Essex County northwest to the border with New York at Montague Township in Sussex County, where the road continues to Port Jervis, New York, as Orange County Route 15. Route 23 heads through Essex and Passaic counties as a two- to four-lane surface road and becomes a six-lane freeway north of a complex interchange with US 46 and I-80 in Wayne. The freeway carries Route 23 north to a concurrency with US 202. Past the freeway portion, the route heads northwest along the border of Morris and Passaic counties as a four- to six-lane arterial road with a wide median at places, winding through mountainous areas and crossing I-287 in Riverdale. The route continues northwest through Sussex County as a mostly two-lane surface road that passes through farmland and woodland as well as the communities of Franklin, Hamburg, and Sussex before reaching the New York state line, just south of an interchange with I-84 and US 6 in Port Jervis, in Montague Township near High Point State Park.
Route 23 was established in 1927 to run from Verona to the New York border near Port Jervis, replacing pre-1927 Route 8 between Verona and Sussex. The route followed two turnpikes that were created in the early 19th century: the Newark-Pompton Turnpike and the Paterson-Hamburg Turnpike. In the mid-1950s, there were plans to build an Interstate Highway along Route 23 between Interstate 80 and Interstate 287, but it was never built. In the 1960s, the route was planned to be upgraded to a freeway all the way up to Port Jervis and south to Piscataway, Middlesex County; however, both freeway proposals were cancelled in the early 1970s. In the mid-1980s, the portion of Route 23 from north of US 46 in Wayne to I-287 in Riverdale was improved, with the road upgraded to a six-lane freeway south of the interchange with Alps Road and to a six-lane arterial road north of Alps Road.
Route description
[edit]Essex and Passaic counties
[edit]Route 23 begins at an intersection with Bloomfield Avenue (CR 506) and Prospect Avenue (CR 577) in Verona, heading to the north through residences and some businesses along four-lane, undivided Pompton Avenue.[1][2] After a short distance, the road forms the border between Cedar Grove to the west and Verona to the east before fully enters Cedar Grove. In Cedar Grove, the route narrows to two lanes at the intersection of West Bradford Avenue/East Bradford Avenue (CR 640) before widening to four lanes again at the intersection of Grove Avenue (CR 639). Shortly before leaving Cedar Grove, Route 23 crosses the intersection of Lindsley Road (CR 604), which also heads to the west as CR 527.[1]
The road crosses into Little Falls, Passaic County, where it narrows to two lanes and becomes Newark-Pompton Turnpike. In Little Falls, Route 23 heads through the central part of the community before crossing the Passaic River into Wayne where the road leaves the unnamed highway briefly and widens to a four lane divided highway. Route 23 passes two shopping malls, Willowbrook Mall and Wayne Towne Center, and enters the "Spaghetti Bowl" interchange with U.S. Route 46 and I-80. Within this interchange, the route passes under NJ Transit's Montclair-Boonton Line.[1][2][3]
North of I-80, the road rejoins the route unnamed and becomes a six-lane freeway, featuring a cloverleaf interchange with West Belt Road that provides access to the Wayne Route 23 Transit Center along the Montclair-Boonton Line. Route 23 continues north with frontage roads serving businesses, coming to an interchange with US 202 and County Route 511 Alternate, forming a concurrency with US 202.[1][2] The road passes over a Norfolk Southern railroad line before it has an interchange with Alps Road (CR 670) and becomes a six-lane arterial road. Following this, the roadway passes west of the Mother's Park & Ride, a park and ride facility serving NJ Transit buses, and reaches an interchange with CR 683, where the Newark-Pompton Turnpike again leaves Route 23 and US 202, which continue north from this point as a surface road through commercial areas. At a u-turn ramp, the eastbound direction of CR 504 follows both directions of the road, having to use the ramp in order to continue across the road.[4] Northbound US 202 splits from Route 23, where the cut-off intersection with CR 504 is located. At this point, the westbound direction of CR 504 and the southbound direction of US 202 follow southbound Route 23 until an intersection.[1]
Morris and Passaic counties
[edit]Route 23 crosses into Pequannock in Morris County and passes over the Pompton River. In Pequannock, the road is a six-lane arterial road with at-grade intersections, some controlled by jughandles, that heads through a mix of businesses and woodland.[1][2] At the north end of Pequannock, the route passes over a New York, Susquehanna and Western Railway branch line and intersects with CR 660, where it rejoins Route 23. The route intersects with Boulevard (CR 511 Alternate) and crosses into Riverdale, with CR 511 Alternate following Route 23 until it heads to the north unnamed.[1] Route 23 interchanges with I-287 and climbs a hill past the interchange, heading to the west. The route runs through Kinnelon, passing over the New York, Susquehanna and Western Railway New Jersey Subdivision line, before entering Butler. In Butler, Route 23 passes through commercial areas, crossing the intersection with Boonton Avenue (CR 511) before heading northwest. The road drops to four lanes, still divided by a jersey barrier.[1][2] It heads under Maple Lake Road before passing through Kinnelon again. Upon leaving Kinnelon, the route enters West Milford in Passaic County at the crossing of the Pequannock River.[1] At this point, the route enters a more wooded, mountainous setting, following the Pequannock River and the New York, Susquehanna and Western Railway line.[2]
Route 23 splits, with the southbound lanes crossing over the Pequannock River into Kinnelon for a time. The route passes by the Charlotteburg Reservoir, a reservoir for the Newark public water supply, and has a rest area in the northbound direction.[1][2] Route 23 intersects with Union Valley Road (CR 513), running concurrently with that route. The southbound lanes cross the Pequannock River into Jefferson Township, Morris County and CR 513 splits from Route 23 by heading south on Green Pond Road. The southbound lanes cross back into West Milford, where the two separate roads rejoin. The intersection of Clinton Road has the longest stoplight signal cycle in the United States, with drivers waiting up to 5 minutes and 33 seconds to cross the intersection.[5] Route 23 continues northwest through forested areas, crossing over the railroad tracks and passing by the Oak Ridge Reservoir, another reservoir that provides water for Newark.[2] The route crosses the Pequannock River three times, running within Jefferson Township between the first two crossings and past the third crossing.[1]
Sussex County
[edit]Route 23 enters Hardyston Township, Sussex County and comes to an intersection with CR 515. Past this intersection, the divided highway ends and Route 23 becomes a two-lane, undivided road. The road heads to the northwest through wooded mountains and runs through the community of Stockholm, where it passes east of a park and ride lot located at a church. The route curves west onto a winding road, passing over the New York, Susquehanna, and Western Railway]] line. The roadway gains a wide painted median, crossing into Franklin and meeting the intersection with Munsonhurst Road (CR 517).[1][2] CR 517 heads north along with Route 23, with the wide median ending, and the road continues through residential and commercial areas of Franklin with a brief wide painted median near the intersection of Franklin Avenue (CR 631).[1] The road crosses a stream, Mill Brook, into Hamburg, where CR 517 splits from Route 23 by heading east on Quarry Road. Route 23 continues north through wooded residential areas of Hamburg, passing under the New York, Susquehanna and Western Railway line and crossing the intersection of Route 94. The route crosses back into Hardyston Township, heading north through a mix of farms and forests.[1][2]
Route 23 crosses the Wallkill River into Wantage Township and continues north to an intersection with Glenwood Road (CR 565), running concurrently with that route and gaining a wide painted median past that intersection which eventually turns into a center left-turn lane. The road passes some businesses and becomes a two-lane divided highway before CR 565 departs from Route 23 by heading west on Lewisburg Road.[1][2] Route 23 crosses into Sussex, where the route becomes a one-way pair along Hamburg Avenue northbound and Walling Avenue southbound, passing by residences. The route intersects with East Main Street (Route 284) before the northbound directions turns left onto Loomis Avenue, where CR 643 continues north on Main Street. Immediately after turning onto Loomis Avenue, CR 639 continues west on Loomis Avenue and Route 23 becomes two-way again, heading north on two-lane undivided Mill Street. The route becomes Clove Avenue before crossing back into Wantage Township.[1][2]
In Wantage Township, Route 23 continues north through farmland and woodland, eventually turning west. It comes to an intersection with Colesville-Lusscroft Road (CR 519) and turns north, running concurrently with that route through forested areas until CR 519 heads north on Greenville Road.[1][2] Route 23 continues northwest and heads across the Kittatinny Mountain, crossing the Appalachian Trail and entering Montague Township, Here, the road heads into heavily forested High Point State Park, which is home to the highest elevation in New Jersey.[2] The route descends through Montague Township along a winding road, passing by some businesses immediately before heading to the New York state line.[1][2] Route 23 officially ends at the state line and the road continues into Orange County, New York as Tappen Road (CR 15) for less than one-half mile. A few feet after the state line, CR 15 comes to an interchange with I-84 before it ends at an intersection with US 6 in Port Jervis.[2] Although I-84 does not enter New Jersey, missing it by only a few feet, the signs on it for the interchange with CR 15 refer to Route 23, even though some signs erroneously refer to it as NY 23.[6]
History
[edit]Route 23 follows the course of the Pompton Trail, and old Lenape trail connecting what is now Glen Ridge, New Jersey to the Minisink Village in what is now Montague.[7][failed verification] In the 19th century, two turnpikes were incorporated that would later become parts of Route 23: the Newark-Pompton Turnpike, which was built between 1806 and 1811; and the Paterson-Hamburg Turnpike, which was incorporated in 1806, and was built from Paterson to a landing in Montague Township, where the Owego and Milford Turnpike continued its route west.[8][9] Parts of the Paterson-Hamburg Turnpike are now CR 650 in Sussex County, the Hamburg Turnpike from Butler to Wayne (signed CR 694, CR 689, and CR 504), Central Avenue through Haledon, and into Paterson as Broadway. Due to realignments, the current alignment of Route 23 bypasses the intersection of these two turnpikes.[2] North of Coleville, the road was maintained by the Coleville and Carpenter's Point Turnpike, chartered in 1850.[10]
In the original system of New Jersey highways, the Newark-Pompton Turnpike and Paterson-Hamburg Turnpike were combined to form pre-1927 Route 8, which ran from Montclair to the New York state line near Unionville, New York, running along the alignment of current Route 23 north to Sussex and following present-day Route 284 north of Sussex.[11] In the 1927 New Jersey State Highway renumbering, Route 23 was designated to run from Route 9 (now CR 506) in Verona north to the New York state line near Port Jervis, replacing pre-1927 Route 8 from Verona to Sussex.[12][13] In the 1930s, communities in Passaic and Morris counties were bypassed by four-lane roads, with Bloomingdale and Butler bypassed in 1933,[14] and Pequannock by 1936.[15]
In the 1955 plan for the Interstate Highway System, an Interstate Highway was planned along the Route 23 corridor between I-80 in Wayne and I-287 in Pompton Plains, also connecting to a proposed Interstate along the Route 3 corridor. However, this proposed Interstate was never built.[16] Plans were made in the early 1960s for a Route 23 freeway running from Interstate 80 north to Interstate 84 in Port Jervis, New York, providing improved freeway access to northwestern New Jersey.[17] This proposed freeway, which was to cost $120 million, was cancelled in the early 1970s due to financial troubles and feared environmental issues.[18] A 1966 proposal called for Route 23 to be extended south as a freeway to I-287 in Piscataway in Middlesex County, running parallel to the Garden State Parkway. This $300 million freeway was added to planning maps in 1969 as Route 807 but was also cancelled in the early 1970s.[19]
In the late 1970s, the New Jersey Department of Transportation made plans to rebuild the section of Route 23, at the time a four-lane undivided road, between I-80 and I-287 to a six-lane freeway between I-80 and Alps Road and a six-lane surface road north of Alps Road.[20] Construction on these improvements began in 1983 and were completed in 1986. With these improvements to the route, many traffic circles were removed, including one at US 46 that was replaced with a complex interchange. In 2008, the Spaghetti Bowl interchange with I-80 and US 46 was improved, costing $70 million.[3]
In 2010, the New Jersey Department of Transportation began plans to move Route 23 to a new alignment through Sussex. With this project, the bridge over the Papakating Creek was replaced and a new road for the southbound lanes was built as an extension of Walling Avenue, while the original Route 23 became northbound only.[21][22] The project lasted from July 2012 to November 2014.[23]
Major intersections
[edit]County | Location | mi[1] | km | Destinations | Notes |
---|---|---|---|---|---|
Essex | Verona | 0.0 | 0.0 | CR 506 (Bloomfield Ave) – Montclair, Livingston CR 577 south (Prospect Ave) | Southern terminus |
Cedar Grove | 3.6 | 5.8 | CR 527 south (Lindsley Rd) | Northern terminus of CR 527 | |
Passaic | Wayne | 4.5 | 7.2 | Hobson Ave | |
5.2 | 8.4 | US 46 / Service Rd – Fairfield | |||
Southern end of the freeway section | |||||
5.4 | 8.7 | I-80 – New York, Netcong, Del. Water Gap | No southbound access to I-80 west; Exit 53 (I-80) | ||
6.0 | 9.7 | West Belt / Service Rd | |||
6.8 | 10.9 | US 202 south / CR 511 Alt. north – Lincoln Pk, Boonton | South end of the overlap with US 202 | ||
7.2 | 11.6 | Alps Rd | Access via CR 670 | ||
Northern end of the freeway section | |||||
7.6 | 12.2 | Nwk-Pompton Tpk - Pequannock | Access via CR 683 | ||
8.9 | 14.3 | US 202 north (Black Oak Ridge Rd) / CR 504 | North end of the overlap with US 202; east end of the overlap with CR 504; no direct access for CR 504 across intersection | ||
Morris | Pequannock Township | 11.9 | 19.2 | Newark Pompton Turnpike - Pequannock | |
12.2 | 19.6 | CR 511 Alt. south (Boulevard) – Pompton Plains, Lincoln Park | South end of the overlap with CR 511 Alt. | ||
Riverdale | 12.4 | 20.0 | CR 511 Alt. north (Nwk Pompton Tpk) Windbeam Rd | North end of CR 511 Alt. overlap | |
12.86 | 20.70 | I-287 to CR 694 / CR 511 Alt. – Mahwah, Morristown | Exit 52 (I-287) | ||
Butler | 14.9 | 24.0 | CR 511 (Boonton Ave) – Kinnelon, Boonton, Butler | ||
Passaic | West Milford | 21.8 | 35.1 | CR 513 north (Union Valley Rd) – West Milford, Greenwood Lake | South end of the overlap with CR 513 |
Morris | Jefferson Township | 22.0 | 35.4 | CR 513 south (Green Pond Rd) – Green Pond | North end of the overlap with CR 513 |
Sussex | Hardyston Township | 26.8 | 43.1 | CR 515 north – Highland Lks, Vernon | Southern terminus of CR 515 |
Franklin | 31.6 | 50.9 | CR 517 south (Munsonhurst Rd) – Ogdensburg, Sparta | South end of the overlap with CR 517 | |
Hamburg | 34.3 | 55.2 | CR 517 north (Quarry Rd) Lime Kiln Rd | North end of the overlap with CR 517 | |
35.4 | 57.0 | Route 94 – Newton, McAfee, Great Gorge, Vernon | |||
Wantage Township | 38.5 | 62.0 | CR 565 north (Glenwood Rd) – Vernon Clark Rd | South end of the overlap with CR 565 | |
39.1 | 62.9 | CR 565 south (Lewisburg Rd) – Frankford | North end of the overlap with CR 565 | ||
Sussex | 39.9 | 64.2 | Route 284 north (E Main St) – Unionville, Middletown | Southern terminus of Route 284 | |
Wantage Township | 45.0 | 72.4 | CR 519 south (Colesville–Lusscroft Rd) – Frankford, Beemerville | South end of the overlap with CR 519 | |
47.2 | 76.0 | CR 519 north (Greenville Rd) – Greenville | North end of the overlap with CR 519 | ||
Montague Township | 52.6 | 84.7 | I-84 / US 6 – Port Jervis, Middletown, Scranton | New York state line; access via CR 15; Exit 1 (I-84) | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
[edit]References
[edit]- ^ a b c d e f g h i j k l m n o p q r s t "New Jersey Route 23 straight line diagram" (PDF). New Jersey Department of Transportation. Retrieved March 17, 2020.
- ^ a b c d e f g h i j k l m n o p q Google (2009-01-05). "overview of New Jersey Route 23" (Map). Google Maps. Google. Retrieved 2009-01-05.
- ^ a b Boud, Tom (September 15, 2008). "Spaghetti Bowl project complete". Passaic Valley Today.
- ^ "Route 202 straight line diagram" (PDF). New Jersey Department of Transportation. Archived (PDF) from the original on 2006-03-18. Retrieved 2009-01-05.
- ^ Chesler, Caren (2001-06-24). "ON THE ROAD; The Longest Light". The New York Times. ISSN 0362-4331. Retrieved 2018-01-12.
- ^ Google (September 10, 2013). "Street View on Interstate 84 eastbound at Exit 1 in New York" (Map). Google Maps. Google. Retrieved September 10, 2013.
- ^ Snyder, John (1969). "The Story of New Jersey's Civil Boundaries 1606-1968" (PDF). Archived (PDF) from the original on 2012-06-05.
{{cite journal}}
: Cite journal requires|journal=
(help) - ^ "History of Pequannock NJ". NJProperty Realty Services. Archived from the original on October 23, 2007. Retrieved 2009-01-06.
- ^ "New Jersey Department of Transportation-New Jersey Historic Bridge Data-Bureau of Environmental Services" (PDF). New Jersey Department of Transportation. Archived (PDF) from the original on 2011-06-16. Retrieved 2009-01-06.
- ^ "Early turnpikes helped all travelers". New Jersey Herald. Retrieved 2020-06-12.
- ^ Annual Report. New Jersey State Highway Department. 1917.
- ^ State of New Jersey, Laws of 1927, Chapter 319.
- ^ 1927 New Jersey Road Map (Map). State of New Jersey. Archived from the original on 2007-10-31. Retrieved 2008-10-08.
- ^ Passaic County Planning Association; Regional Plan Association (1934). Passaic County and the Regional Plan: Just What This Great Enterprise Means to the County and Particularly to the Community in Which You Live. New York: Regional Plan Association. p. 14. hdl:2027/uc1.b4592740.
- ^ Hewitt, George (January 1936). Map of Passaic County, N.J., showing Highway System (Map).
- ^ General Location of National System of Interstate Highways in New York, New York (Map). Bureau of Public Roads. 1955. Retrieved 2009-12-22.
- ^ Regional Highways: Status Report. Tri-State Transportation Commission. 1962.
- ^ "Interstate 80-84 Links Opposed". The New York Times. November 27, 1972.
- ^ Burks, Edward C. (November 4, 1973). "Highway Programs Showing Progress". The New York Times.
- ^ Narvaez, Alfonso A. (September 9, 1979). "Transport Bond Issue At Stake; Bonds for Transit". The New York Times.
- ^ "Route 23 Sussex Borough Realignment - Overview". New Jersey Department of Transportation. Retrieved 2010-08-18.
- ^ "Route 23 Sussex Borough Realignment Project Plan" (PDF). New Jersey Department of Transportation. Archived (PDF) from the original on 2011-09-29. Retrieved 2010-08-18.
- ^ "Route 23 Sussex Borough Realignment - Schedule". New Jersey Department of Transportation. Retrieved 2010-08-18.
External links
[edit]